Hyperscale data center campus development with dedicated high-tension power infrastructure

Powered Land for 50–100 MW Data Centre Campuses.

Ekrej delivers shovel-ready powered land for hyperscale and enterprise data centre campuses across Maharashtra, Karnataka and Tamil Nadu. Diligenced across high-voltage power, closed-loop water, approvals and GO in place, and a 60-year clean legal dossier.

IT load
50–100 MW
Grid at meter
70–140 MW
Land extent
15–30 acres
Substation
220/400 kV within 5 km
Water design
0.5–2 m³/MW/day
Legal dossier
60-year clean title
The Data Centre Land Mandate

A parcel has to survive power, water and title. We ensure it does.

Every Ekrej data centre site is purpose-selected to meet the demanding physical and electrical infrastructure needs of hyperscalers. In practice that means 15–30 contiguous acres, an existing 220 kV or 400 kV substation within 5 km with verified spare capacity, and an assured non-groundwater supply for closed-loop cooling.

We carry title diligence, conversion permissions, approvals and GO in place, and evacuation feasibility upfront. Developers acquire shovel-ready powered sites ready for immediate campus development under a single-owner SPV structure.

Critical power infrastructure and facility envelope for hyperscale data center
The Ekrej Data Centre Standard

Five Core Engineering & Legal Gates for Shovel-Ready Campuses

Every parcel delivered by Ekrej clears strict technical, legal, and environmental benchmarks. Click any domain below to inspect the complete engineering specifications, sizing arithmetic, and knockout criteria.

01

High-Voltage Power & Substation Evacuation

220/400 kV extra-high-tension (EHT) substation within 5 km · Dual redundant feeder path · 70–140 MW at meter.

Inspect Specification
02

Assured Non-Groundwater Water Supply

Confirmed municipal, industrial water board (MIDC/KIADB/SIPCOT), or reclaimed supply in KLD supporting closed-loop cooling.

Inspect Specification
03

Land Extent, Geometry & 60-Year Title Trail

15–30 contiguous acres · Single-owner SPV structure · Approvals and GO in place · 60-year clean legal dossier.

Inspect Specification
04

Hazard, Flood & Environmental Screening

Outside 100-year floodplain · FFL +1.5m above recorded HFL · ≥1 km from chemical/LPG storage · Seismic Zone II/III.

Inspect Specification
05

Abnormal Logistics Access & Dual Dark Fibre

18–24 m approach road verified for 120–180 tonne transformer transport · Dual-entry dark fibre within 2 km.

Inspect Specification
Data Centre Enquiry & Sourcing

Submit Your Data Centre Campus Mandate

Tell us your IT load requirements, target state, and cooling parameters. Our infrastructure land team will share matching pre-screened site dossiers within one working day.

I am looking for / I represent:
1. Requirement
2. Contact Details
Organization Type
Target IT Load
Substation Class / Redundancy
Target Deployment Timeline